☎ +49 173 3940906
Cruise context Personal recommendation based on travel situation.

Logbook

Summer Cruise 2026 aboard SY HERA

60 stories aboard SY HERA between Monfalcone, Venice and Croatia.

Logbook Logbook

HERA’s 2026 summer cruise runs from Monfalcone along the Italian coast to Caorle and Venice, across the Adriatic to the Croatian islands and back towards the Gulf of Trieste. This page links the voyage with the practical questions that genuinely arise aboard a Bavaria 50 of roughly 15 metres.

Twenty stages of one voyage

The first articles follow the cruise from the heat in Monfalcone through Koper, Caorle and the Venice lagoon. HERA berthed at San Giorgio Maggiore opposite St Mark’s Square. The route then continues across the Adriatic via Pula, Unije, Mali Lošinj, Medulin, Rovinj and Umag. Piran is experienced from the water; Koper is planned for fuel before the return to Monfalcone.

Route knowledge and onboard practice

Articles 21 to 40 examine commercial shipping, fishing marks, Venice with a 50-foot yacht, traffic separation, drift, Porer and the buoy field at Unije. Articles 41 to 60 cover the bilge, the incorrectly furled mainsail, radar failure, independent navigation tools, HERA’s experienced engine range, water reserves, the manual bathing platform and buoy manoeuvres. Each keeps a separate purpose while remaining part of the same cruise.

All articles in the series

  1. 1. The evening before departure: summer heat in Monfalcone
  2. 2. Almost a full moon: talking until two in the morning
  3. 3. Koper for fuel: the first plan of the day
  4. 4. Tankers at anchor off Koper
  5. 5. Sails up at last: nine knots of wind for HERA
  6. 6. Returning to Monfalcone before the night passage
  7. 7. Feeling like 50 degrees on the way west
  8. 8. Scrambled eggs ready, crew not quite
  9. 9. Along the Italian coast towards Caorle
  10. 10. Caorle as a stop on the way to Venice
  11. 11. Entering the Venetian Lagoon
  12. 12. San Giorgio opposite St Mark's Square
  13. 13. From Venice across the Adriatic
  14. 14. Commercial shipping and traffic separation schemes en route to Croatia
  15. 15. Pula astern, Unije ahead
  16. 16. From the buoy at Unije to Mali Lošinj
  17. 17. Light wind between Mali Lošinj and Medulin
  18. 18. Approaching Rovinj town harbour
  19. 19. Umag, Piran and the final fuel stop in Koper
  20. 20. Returning home to Monfalcone
  21. 21. Koper from the water: commercial port and sailing destination
  22. 22. Slovenia as a gateway to the Adriatic
  23. 23. Fishing flags and lines along the Italian coast
  24. 24. Approaching Venice with a 50-foot yacht
  25. 25. San Giorgio Maggiore with a 50-foot yacht
  26. 26. Finding a berth in Venice without a reservation
  27. 27. The berth at the end of the floating pontoon
  28. 28. Preparing an Adriatic crossing carefully
  29. 29. What a traffic separation scheme means for sailors
  30. 30. Encounters with commercial shipping
  31. 31. Allowing for drift on a longer crossing
  32. 32. The courtesy flag when entering Croatia
  33. 33. Porer lighthouse as a waypoint
  34. 34. The first islands before Unije
  35. 35. Entering the buoy field at Unije
  36. 36. Mali Lošinj after a short swimming stage
  37. 37. Medulin after a light-wind stage
  38. 38. Preparing to berth in Rovinj town harbour
  39. 39. Piran and Koper on the final northern stage
  40. 40. Why fuel stops belong to route planning
  41. 41. Water in the bilge: the right first steps
  42. 42. Why the bilge is checked regularly
  43. 43. Water aboard again after maintenance
  44. 44. A dry bilge as a technical reference
  45. 45. Pump out the water and continue observing the cause
  46. 46. The in-mast mainsail was furled the wrong way
  47. 47. How an in-mast furling mainsail works
  48. 48. When the mainsail jams: unload before acting
  49. 49. Thunderstorm in harbour: when sail work must wait
  50. 50. Before crossing the Adriatic: complete the systems check
  51. 51. The radar suddenly stops working
  52. 52. Navigation without available radar
  53. 53. Technical redundancy on a cruising yacht
  54. 54. A sensible engine-speed range for SY HERA
  55. 55. Why more engine speed is not always better
  56. 56. Taking on water before a longer stage
  57. 57. Drinking water and departure routine aboard
  58. 58. The Bavaria 50’s manual bathing platform
  59. 59. Picking up a buoy with a 15-metre yacht
  60. 60. A buoy manoeuvre is never only routine

Talk to ONBOAT.

If a story raises your own question: we support yacht projects, deliveries, service and owner representation.

View service